Environmental Impact Assessment for a 25MW Gas Power Generating Plant Near Ring Road Ibadan South LGA, Oyo State, Nigeria
This EIA was implemented for a 25MW Gas Power Generating Plant in Ibadan (Near Ring Road(, Nigeria. The proposed plant would involve delivery and installation of ten (10) units of JGS 620 GS-N.L-F13 Reciprocating Engines. Each engine unit with installed capacity of 3.044MW. The Engines will be powered by natural gas supplied by Nigeria Gas Company (NGC) through the Escravos-to-Lagos (ELP) Gas Pipeline System teeing off at Ibafo area of Ogun State.
The EIA was managed by Mr. Bartholomew Ndulue, presently a member of EcoPro team on behalf of Triple 'E' Systems Associates Limited.
The EIA was completed in 2011